Fully Prefabricated Method Factory Prefabrication On-Site Lifting & Installation Time-Lapse Documentation | Construction Characteristics Steel Structures Interior & Exterior Walls Floor Slabs |
| Materials | Thermal Conductivity-Λ W/(m·K) |
| Guyue Panel Wall | 0.13 |
| Reinforced Concrete(RC) | 1.740 |
Red Clay Brick | 0.860 |
Hollow Cement Board | 0.738 |
Lightweight Cement Board | 0.750 |
Project Item | Gu Yue Floor & Wall Panel System | Reinforced Concrete (RC) System |
Construction Duration | Fast Construction(Dry Prefabricated Modular System) *Overall construction time is reduced by approximately 50% compared to RC structures. | Slow Construction(Layer-by-Layer Concrete Pouring) *Work crews must wait for one another, and curing time is required. |
Formwork Works | Only the “foundation section” is required*Overall reduction compared to RC:85–95%. | Formwork Works in Taiwan *Costs have increased significantly, with severe labor shortages. |
Rebar Tying | Only the “foundation section” is required *Overall reduction compared to RC:75–80%. | Rebar Works in Taiwan *Prices continue to rise, and construction progress is slow. |
Concrete Pouring | Only the “foundation section” is required *Overall reduction compared to RC:approximately 80%. | Concrete Works in Taiwan *Quality varies, and labor shortages occur frequently. |
Construction Method Integration | *This construction method effectively addresses the construction industry’s most urgent challenges, including seismic resistance, sound insulation, thermal insulation, construction duration, and cost efficiency. | Traditional RC Construction Methods *Multiple construction interfaces lead to project delays, difficulty in quality control, and increased costs—posing major challenges to the construction industry. |
Overall Total Cost | Minimal use of formwork, rebar, and concrete *Overall construction cost is reduced by 10–25% compared to RC structures. | RC Building Construction Costs in Taiwan *Overall costs remain consistently high. |